Fetching the paper…
Reading the bibliography…
Short-term forecasting of residential and commercial building energy consumption is widely used in power systems and continues to grow in importance.
An analysis of transformations
Box, G. E. and Cox, D. R · 1964
Earlier work this paper cites.
A new algorithm for data compression
Gage, P · 1994
Earlier work this paper cites.
Long short-term memory
Hochreiter, S. and Schmidhuber, J · 1997
Earlier work this paper cites.
Algorithms for mining distancebased outliers in large datasets
Knox, E. M. and Ng, R. T · 1998
Earlier work this paper cites.
Energyplus: creating a new-generation building energy simulation program
Crawley, D. B., Lawrie, L. K., Winkelmann, F. C., Buhl, W. F., Huang, Y. J., Pedersen, C. O., Strand, R. K., Liesen, R. J., Fisher, D. E., Witte, M. J., et al · 2001
Earlier work this paper cites.
Deep transformer models for time series forecasting: The influenza prevalence case
Wu, N., Green, B., Ben, X., and O’Banion, S · 2001
Earlier work this paper cites.
Daily load forecasting based on previous day load
Tsakoumis, A., Vladov, S., and Mladenov, V · 2002
Earlier work this paper cites.
Smart*: An open data set and tools for enabling research in sustainable homes
Barker, S., Mishra, A., Irwin, D., Cecchet, E., Shenoy, P., Albrecht, J., et al · 2012
Earlier work this paper cites.
Individual household electric power consumption
Hebrail, G. and Berard, A · 2012
Earlier work this paper cites.
Global energy forecasting competition 2012
Hong, T., Pinson, P., and Fan, S · 2013
Earlier work this paper cites.
Theory and applications of hvac control systems–a review of model predictive control (mpc)
Afram, A. and Janabi-Sharifi, F · 2014
Earlier work this paper cites.
Probabilistic forecasting
Gneiting, T. and Katzfuss, M · 2014
Earlier work this paper cites.
Probabilistic electric load forecasting: A tutorial review
Hong, T. and Fan, S · 2015
Earlier work this paper cites.
Incorporating practice theory in sub-profile models for short term aggregated residential load forecasting
Stephen, B., Tang, X., Harvey, P. R., Galloway, S., and Jennett, K. I · 2015
Earlier work this paper cites.
ElectricityLoadDiagrams20112014
Trindade, A · 2015
Earlier work this paper cites.
Bridging nonlinearities and stochastic regularizers with gaussian error linear units
Hendrycks, D. and Gimpel, K · 2016
Earlier work this paper cites.
Deep learning for estimating building energy consumption
Mocanu, E., Nguyen, P. H., Gibescu, M., and Kling, W. L · 2016
Earlier work this paper cites.
A review of data-driven building energy consumption prediction studies
Amasyali, K. and El-Gohary, N. M · 2017
Cited alongside, same era.
Lightgbm: A highly efficient gradient boosting decision tree
Ke, G., Meng, Q., Finley, T., Wang, T., Chen, W., Ma, W., Ye, Q., and Liu, T.-Y · 2017
Cited alongside, same era.
Vaswani, A., Shazeer, N., Parmar, N., Uszkoreit, J., Jones, L., Gomez, A. N., Kaiser, L., and Polosukhin, I · 2017
Cited alongside, same era.
Deep reinforcement learning for building hvac control
Wei, T., Wang, Y., and Zhu, Q · 2017
Cited alongside, same era.
Smartmeter energy consumption data in london households, 2018
Networks, U. P · 2018
Cited alongside, same era.
Improving language understanding by generative pre-training
Pecan street dataport, 2021
Street, P · 2021
Later among the works it cites.
End-use load profiles for the us building stock: Methodology and results of model calibration, validation, and uncertainty quantification
Wilson, E. J., Parker, A., Fontanini, A., Present, E., Reyna, J. L., Adhikari, R., Bianchi, C., CaraDonna, C., Dahlhausen, M., Kim, J., et al · 2021
Later among the works it cites.
A review of machine learning in building load prediction
Zhang, L., Wen, J., Li, Y., Chen, J., Ye, Y., Fu, Y., and Livingood, W · 2021
Later among the works it cites.
Transferrable model-agnostic meta-learning for short-term household load forecasting with limited training data
He, Y., Luo, F., and Ranzi, G · 2022
Later among the works it cites.
Transformer neural networks for building load forecasting
Hertel, M., Ott, S., Neumann, O., Schäfer, B., Mikut, R., and Hagenmeyer, V · 2022
Later among the works it cites.
alphaXiv searches the wider corpus for related work and actual follow-ups.
alphaXiv is searching for related work…
Radford, A., Narasimhan, K., Salimans, T., Sutskever, I., et al · 2018
Cited alongside, same era.
Billion-scale similarity search with GPUs
Johnson, J., Douze, M., and Jégou, H · 2019
Cited alongside, same era.
Decoupled weight decay regularization
Loshchilov, I. and Hutter, F · 2019
Cited alongside, same era.
PyTorch: An Imperative Style, High-Performance Deep Learning Library
Paszke, A., Gross, S., Massa, F., Lerer, A., Bradbury, J., Chanan, G., Killeen, T., Lin, Z., Gimelshein, N., Antiga, L., Desmaison, A., Kopf, A., Yang, E., DeVito, Z., Raison, M., Tejani, A., Chilamkurthy, S., Steiner, B., Fang, L., Bai, J., and Chintala, S · 2019
Cited alongside, same era.
Generating diverse high-fidelity images with vq-vae-2
Razavi, A., Van den Oord, A., and Vinyals, O · 2019
Cited alongside, same era.
6-second load measurement dataset, 2020
Ardakanian, O., Huo, S., and Keshav, S · 2020
Cited alongside, same era.
All you need to know about model predictive control for buildings
Drgoňa, J., Arroyo, J., Figueroa, I. C., Blum, D., Arendt, K., Kim, D., Ollé, E. P., Oravec, J., Wetter, M., Vrabie, D. L., et al · 2020
Cited alongside, same era.
Huy, P. C., Minh, N. Q., Tien, N. D., and Anh, T. T. Q · 2022
Later among the works it cites.
Buildings
IEA · 2022
Later among the works it cites.
Specialist vs generalist: A transformer architecture for global forecasting energy time series
Rathnayaka, P., Moraliyage, H., Mills, N., De Silva, D., and Jennings, A · 2022
Later among the works it cites.
Are transformers effective for time series forecasting?
Zeng, A., Chen, M., Zhang, L., and Xu, Q · 2022
Later among the works it cites.
Short-term electrical load forecasting based on time augmented transformer
Zhang, G., Wei, C., Jing, C., and Wang, Y · 2022
Later among the works it cites.
skforecast, 5 2023
Amat Rodrigo, J. and Escobar Ortiz, J · 2023
Closest in time.
Energy information administration may 2023 monthly energy review
EIA · 2023
Closest in time.
Energyplus
National Renewable Energy Lab · 2023
Closest in time.
A time series is worth 64 words: Long-term forecasting with transformers
Nie, Y., H. Nguyen, N., Sinthong, P., and Kalagnanam, J · 2023
Closest in time.
Timesnet: Temporal 2d-variation modeling for general time series analysis
Wu, H., Hu, T., Liu, Y., Zhou, H., Wang, J., and Long, M · 2023
Closest in time.
The building data genome project 2, energy meter data from the ASHRAE great energy predictor III competition
Miller, C., Kathirgamanathan, A., Picchetti, B., Arjunan, P., Park, J. Y., Nagy, Z., Raftery, P., Hobson, B. W., Shi, Z., and Meggers, F · 2052
Closest in time.